1982 Citation II

  • Keith Freon Air Conditioner
  • Cockpit Voice Recorder
  • Lead Acid Battery
  • Engine Sync
  • RVSM (Cessna SB550-37-79)
  • Safe Flight Gross Weight Increase
  • Aft baggage Mod
  • Thrust Reversers
  • Flushing Aft Lavatory
  • Rosen Sun Visors
  • ADR Electronic Flight Bag



Airframe Total Time. 9,408 Airframe Total Landings 6,664
Engine 1 PCE71107

  • Total Time 9,200
  • Total Cycles 6,355
  • Overhaul: Due in 906 hours
  • HSI: Due in 916 hours

Engine 2 PCE71103:

  • Total Time: 9,174
  • Total Cycles: 6,304
  • Overhaul: Due in 906 hours
  • HSI: Due in 1,005 hours

Note: Hot Sections completed by Duncan Aviation in 2009 and High Turbine (HT) Blades changed to the “On Condition” Blades.

  • Phase 1-4 Inspections: Due 4/30/18
  • Phase 5: Due 2/28/18
  • 91.411 and 413 Certifications: Due 3/31/18
  • Maintenance Tracking: CESCOM

PDF Brochure

PO BOX 2260 • 124 SOUTH MAIN STREET, SUITE 212

LIVINGSTON, MONTANA 59047